KT-70E / KT-90E / KT-70SE User Manual
Page 33 of 59
24 April 2018
•
After moving a cold compressor to a warm environment (requires a 15 minute warm
up period)
8.2.1.2.
pressure buildup
Note: Units with MPV will
not show pressure until min-
imum pressure is achieved.
1.
Build up pressure to 100 bar
8.2.1.3.
To Fill the pressure cylinder.
1.
Open filling valve slowly
(on compressor, on hose or
on target cylinder)
The filling process is to be
monitored !!
Units with Minimum Pres-
sure Valves should open fill-
ing valve prior to pressure
reaching MPV setting
i
Summary of Contents for KT-70E
Page 49: ...KT 70E KT 90E KT 70SE User Manual Page 49 of 59 24 April 2018 Figure F First Stage Cylinder...
Page 51: ...KT 70E KT 90E KT 70SE User Manual Page 51 of 59 24 April 2018 Figure 8 Third Stage Cylinder...
Page 53: ...KT 70E KT 90E KT 70SE User Manual Page 53 of 59 24 April 2018 Figure 10 Filter Housing...
Page 54: ...KT 70E KT 90E KT 70SE User Manual Page 54 of 59 24 April 2018 Figure K Casing...