Komptec GmbH. KT-90A User Manual
Page 29 of 52
v1.0a; 8 May 2016
•
After being moved
Following this warm up period, proceed with item 2 above
8.2.1.2.
pressure buildup
1.
Build up pressure to 100 bar
8.2.1.3.
To Fill the pressure cylinder
1.
Open filling valve slowly
The filling process is to be
monitored !!
i