38
322217/G
SubConn
®
connectors should not be exposed to extended periods of heat or direct
sunlight. If a connector becomes very dry, it should be soaked in fresh water before
use.
5
Mount the arrangement to the customer’s structure.
Installing a transponder with an MGC end
cap
Four insulation sleeves are delivered with the module.
Prerequisites
For safety reasons, the transponder is delivered with the battery outside. The battery
must be inserted and connected before the transponder is deployed.
You need 4 M8 bolts with a fitting length and strength to install the MGC.
Procedure
1
Mount the transponder with the transducer having a free line of sight.
2
Enter the insulation sleeves into the bolt holes in the base of the unit.
3
Enter M8 bolts of fitting length and strength to the sleeves.
4
Fasten the bolts.
Installing a floating collar
The transponder must have a release unit, or an adapter for a basic end cap, to install a
floating collar.
Prerequisites
The transponder must have a release unit, or an adapter for a basic end cap, to install a
floating collar.
Procedure
1
Remove the two securing screws,
S
on the release unit.
2
Insert the transponder,
T
in the floating collar.
Kongsberg cNODE Instruction Manual
Summary of Contents for cNODE Maxi
Page 1: ...Instruction Manual cNODE Maxi and Midi Transponders Medium Frequency 4000 metres ...
Page 2: ......
Page 69: ...322217 G 67 Differential inclinometer arrangement drawing About drawings ...
Page 70: ...68 322217 G Current meter arrangement drawing Kongsberg cNODE Instruction Manual ...
Page 98: ... 2019 Kongsberg Maritime ...