Once the carton is open, carefully remove all loose packing and insulation material.
7
Check for user manuals and other documents that may have been added to the
carton during packing.
8
Check also for special tools, door keys etc.
Unpacking mechanical units
Prior to installation or use, mechanical units must be unpacked from their transport boxes.
It is important that this unpacking is done without inflicting damage to the equipment.
Prerequisites
Observe the procedure for unpacking of standard parts and units.
Context
Mechanical and electromechanical units may be heavy.
Procedure
1
Obtain the necessary lifting equipment, and make sure that the equipment is
certified for the weight.
2
Lift the unit out of the transportation box.
3
Place it in a stable position on the floor/work bench.
4
Inspect the unit for visual damage.
5
Remove any packing material that may be inside the unit.
6
Collect and keep the relevant user manuals and/or documents provided with the unit.
Unpacking electronic and electromechanical units
Prior to installation or use, electronic and electromechanical units must be unpacked
from their transport boxes. It is important that unpacking is done without inflicting
damage to the equipment.
Context
Electronic and electromechanical units are normally wrapped in clear antistatic plastic
bags.
Do not break the seal to open a printed circuit board, an electronic module or a unit
before it shall be used. If the unit is returned with a broken seal we will assume that it
has been used. You will then be billed accordingly.
EA640 Installation Manual
Summary of Contents for EA640
Page 62: ...62 413764 B 388697 WBT outline dimensions EA640 Installation Manual ...
Page 63: ...413764 B 63 Drawing file ...
Page 64: ...64 413764 B 400930 WBT Cabinet outline dimensions EA640 Installation Manual ...
Page 65: ...413764 B 65 Drawing file ...
Page 66: ...66 413764 B EA640 Installation Manual ...
Page 67: ...413764 B 67 Drawing file ...
Page 93: ......
Page 94: ... 2018 Kongsberg Maritime ...