2/27/2020 5:45 PM
/
D11
13
< Auto Run >
1
Turn ON the main power switch.
The main power switch is located inside the machine
and can be reached from the front door.
With the main power switch turned on, the Power
LED on the control panel lights up in orange.
2
Turn ON the sub power switch.
3
The Wake-up screen is displayed.
1b. Daily Care / Execution (= Package Auto Color Adjustment)
If the print engine is turned ON and OFF every day,
go to <Auto Run> Step 1 to 6.
If the print engine is running through the days and not turned OFF in daily use,
go to <Manual Execution> Step 7 to 10