1-10
(10) Remove the gear by removing the E-ring, then remove
the fulcrum screw and plain washer.
Gear
E-ring
Plain washer
Fulcrum screw
(11) Slide the LCT out to the front, and remove the fulcrum
screw and plain washer from the front side, then remove
changeover conveyance guide 3.
Changeover conveyance guide 3
Plain washer
Fulcrum screw
MAIN DRIVE SECTION
ADU paper conveyance 2 PS
(PS104)
ADU paper conveyance 3 PS
(PS105)
Connector (CN231)
Connector (CN232)
Set screws
Changeover conveyance guide 4
(12) Remove the two set screws, then remove the change-
over conveyance guide 4.
(13) Disconnect the connectors (CN231, CN232) from ADU
paper conveyance PS2 and 3 PSs (PS104, PS105).
(14) Reinstall the guides in the reverse order of removal.