Ch.1 Pre-installation Information
< 10 >
DRYPRO Vstage MODEL 793 Installation Manual Ver.1.00 2004.11
1.1
Installation Work Flow
For maximum efficiency, the installation procedure should be carried out in the sequence detailed below.
Checking Image
Quality
(Ch.4)
Removing Potective Hardwares and installing options
2.4.2 Removing Potective Hardware Securing Back of Exposure Unit (p.00)
2.4.3 Removing Potective Hardware Securing Front of Exposure Unit (p.00)
2.4.4 Removing Protective Sheet from Exposure Unit Conveyor Rollers (p.00)
2.4.5 Removing Potective Hardware Securing Pickup Unit (X 2 trays) (p.00)
2.4.7 Installing Cover (1) (p.00)
2.4.8 Removing Protective Sheet from Heat Processing Unit (p.00)
2.4.9 Installing Heat Processing Unit (p.00)
2.4.10 Installing Deodorant Filter and Deodorant Filter Case (p.00)
2.4.13 Installing Cover (2) (p.00)
Preparations
- Checking installation conditions (p.00)
- Checking the network (p.00)
- Preparation of tools (p.00)
Service Maintenance Mode Settings
(Operation Panel or WEB maintenance PC)
3.4
Film Settings (p.00)
3.5
SCP Settings (p.00)
3.6
SCU Settings (p.00)
3.7
System Settings (p.00)
3.8
User Registration (p.00)
3.9
Print Condition Settings (p.00)
3.10
LUT Settings (p.00)
3.11
Setting Current Time and Date (p.00)
3.12
Regular Inspection Settings (p.00)
3.13
Sorter Settings (p.00)
Test Printing
Start Up
Installing Accessories
- Exhaust Duct (p.00)
- Film Holder (p.00)
- UPS (Option)
Unpacking
(p.00)
Installation
(Ch.2)
Preparations
(Ch.1)
Settings
(Ch.3)
- Flat Pattern Printing (p.00)
- SMPTE Pattern Printing (p.00)
Calibration of Internal Densitometer
(p.00)
Loading film
(p.00)
Printing
from and Backup
of External
Devices
(Ch.5)
Checking printing from external devices
(Network cable connections, clamp installation)
(p.00)
Backup
- CF Memory Data Backup (CF -> HDD) (p.00)
- Setting Data Backup (DRYPRO 793 -> Maintenance PC) (p.00)
2.4.6 Installing Supply Unit (Option) (p.00)
2.4.11 Installing Lis-793 (p.00)
2.4.12 Installing 1GB Print Memory (p.00)