Ch.2 Unpacking and Installation
< 56 >
DRYPRO Vstage MODEL 793 Installation Manual Ver.1.00 2004.11
18
Affix film size labels to the level positions on
each of the supply trays.
- Proceed to removal of protective sheets from the
heat processing drum (2.4.8).
Leave the front cover open for subsequent
procedures.
Example illustrating:
Supply tray 1: 14X17. blue
Supply tray 2: 11X14, blue
Supply tray 3: 8X10: blue