Ch.2 Unpacking and Installation
< 83 >
DRYPRO Vstage MODEL 793 Installation Manual Ver.1.00 2004.11
2.6 Starting Up
The procedure for starting up DRYPRO 793 after completion of all installation and part removals is described
below.
1
Check to ensure that the breaker at the bottom
of the right cover of DRYPRO 793 is off.
3
Connect the power cable to the facility power
outlet (3P).
2
Connect the power cable to the power socket at
the bottom left of the rear side of DRYPRO 793.
5
Press and hold down the operation button on
the operation panel for about 1 second.
- This will result of initiation of initial operation
followed by a tone (beep) upon completion and
display of "Film Set" under loaded film
information.
- Proceed to DRYPRO 793 settings.
In cases where a 3P outlet is not available, a 3P-2P adapter must be used.
When using a 3P-2P adapter, ensure that the adapter earth is connected to the
facility earth terminal.
Do not connect the
Ethernet cable yet.
The Ethernet cable
should be connected
only after completion of
all DRYPRO 793
settings.
4
Switch on the breaker at the bottom of the right
cover of DRYPRO 793.
2.6.1
Switching On Power
The procedure for switching on DRYPRO 793 power is described below.
ON
OFF
2
ON
OFF
Do not load film yet.