Once all pipes are in their fittings push down gently on all connections. Roll the Garden onto each
of its four sides repeating the procedure. Then stand the Garden on its feet.
Locate the top bars identified by large 1 ½” tees at each end with 3 small 1” tees along their
horizontal axis’. Identical top bars go atop both the N and S ends and locking down the structure.
Top bars have two horizontal pipe sections: 12 ½ and 8 ½ inches. When standing in front of the N
end looking towards the S end the longer 12 ½” section goes to your right.
Figure 9. Top bars, identical components atop both the N and S ends
Figure 10. The Garden structure on its feet with the identical N and S top bars attached. Notice that the longer pipe segment on the
top bars goes to the right when looking from N end to S end as shown above.
Next insert the central reservoir support bar into the crosses on the side bottom bars.