11
2.10 Rack Mounting Installation
The Rack Mount Kit is attached inside the package.
2.8.1 Attach the brackets to the device by using the screws provided in the Rack Mount kit.
2.8.2 Mount the device in the 19’ rack by using four rack-mounting screws provided by
the rack manufacturer.
When installing multiple switches, mount them in the rack one below the other. It’s requested to reserve
0.5U-1U free space for multiple switches installing. This is important to disperse the heat generated by
the switch.
Notice when installing:
Temperature: Check if the rack environment temperature conforms to the specified operating
temperature range.
Mechanical Loading: Do no place any equipment on top of the switch
Grounding: Rack-mounted equipment should be properly grounded.