7
Figure of JetNet 6910G-M12, 7+3G Managed Ethernet Switch
2.2 Wiring Power Inputs
For DC power inputs.
1.
Insert positive and negative wires into V+ and V- contacts respectively of the M12
connector (Plug-side).
2.
Tighten the nuts to prevent the loosening of the M12
connectors.
3.
PWR input supports power redundancy and polarity-
reverse protection functions.
Note 1: In order to protect the switch itself, a safe power-port
connection can be achieved by following procedures:
1.
Turn-off the power supply.
2.
Connect the power wire to the Plug-side connector.
3.
Plug the connector into the switch Power port.
4.
Power-on the power supply.
Note 2: If 2 power supplies are connected to the switch, it will be powered from the one
with higher voltage level.
Note 3: The connection of LVDC (24V) model should be dual input supplied to obtain
higher enough current in order to perform high power PoE loading.
2.3 Wiring Earth Ground
To ensure the system not being damaged by noise or any electrical shock, it is strongly
recommended to assure exact connection into JetNet 6910G-M12 with Earth Ground.
Ensure the lighting/surge enable screw is tightened when connect the Earth Ground.
2.4 Wiring PoE/Fast/Gigabit Ethernet Ports
JetNet 6910G-M12 includes 7 Fast Ethernet ports(#1~#7, M12 D-code), 3 M12
Summary of Contents for JetNet 6910G-M12 Series
Page 5: ...1 5 4 About Korenix 141...