background image

INS

If yo

size 

cabl

Insta

3-P

 
UK 
2006
Euro
UK) 
from
If  yo

info

 

WH

We 

1)Th

rate

2)M

need

3)Bla

 

UN

Elec

diffe

on y

STALLING S

ou have a 3-

of your cab

es using the

alling SEM30

PHASE WIR

until  Ap

ope 

(inclu

m April 2006 

ou  are  unsu

rmation 

HAT IS THE

have 3 di

he alarm fun

. This is usef

onthly targe

d to monito

ack out time

DERSTAND

tricity suppl

erent times o

your electric

SEM3000 I

-phase supp

bles. Fitting 

e informatio

000 in USA &

RING COD

L1 

pril  Red 

ude 

 

Brown 

ure  about  i

E ALARM F

ifferent ala

ction is desi

ful if your ho

et setting ov

r costs close

e alarm. This

DING TARI

iers sell elec

of the night 

ity bill. 

IN A 3-PH

ply you will n

the sensors

n below: 

& JAPAN : W

 

ES 

L2 
Yello

Blac

installation 

FUNCTION

arm display

igned to wa

ousehold is 

ver alarm. T

ely. 

s is useful fo

FFS AND 

ctricity at dif

 or day. The

ASE SUPP

need two ad

s is the sam

We supply 2 

ow 

please  cons

N? 

y. 

rn you when

running on 

This is usefu

or to support

TIERED TA

fferent rates

e rate you pa

LY 

dditional Sen

me process a

clamps for 

L3 
Blue 

Grey 

sult  a  qualif

n your pre-d

a budget an

l if your ho

t the power 

ARIFFS 

s to different

ay for your 

nsors and po

as above bu

100V ~ 120V

Neut
Black

Blue

fied  electric

 

determined e

nd you need

ousehold is 

plant & gov

t people acr

electricity is

ossibly large

ut you will n

V measurem

ral 

ian  or  visit 

electricity us

 to monitor 

running on 

vernment. 

ross the cou

called a “ta

er sensors de

need to ide

ment. 

Earth 
Green/yello
(green on o
Green/yello

www.theow

sage peaks a

r costs closel

a monthly 

untry. Rates 

ariff” and is 

epending on

ntify the co

ow striped

old installati

ow striped

wl.com  for  m

above a spec

ly. 

budget and

may also va

clearly ident

n the 

orrect 

ons)

more 

cified 

 you 

ry at 

tified 

Summary of Contents for SEM3000 Series

Page 1: ...a short bee symbol NOW ation M wdriver rem removed bat rear of the T the Display onds on the ess SET bu n the botto CHANN p W ENERGY sc Manual move the Sen tteries then y Transmitter Unit Insert rear...

Page 2: ...low nit for to sto and corner o note this m y illuminated p to 40 met REEN WITH nnel numbe h Watt unit and mbol mark a e energy con method sele is special rat is day toda w If you ar ore of the main s...

Page 3: ...4 step T rmal display hand side it and this we me date we display will hear a and SET W til you hear ould see belo king Press WN key to ad key to adju key to adjust WN key to ad ANNEL S F C1 symb see...

Page 4: ...Press MENU to move next position and adjust the correct value Change all the correct value continuously 7 Press CHANGE to store E TARIFF RATE FOR 4 STEP TIERED RATE C5 JAPAN TOKYO ELECTRIC TIER No TIE...

Page 5: ...he correct value Change all the value continuously 9 Press MENU key to see F 90kWh blinking Press UP key to change the Tier 2 and you can see 230 KWh 10 You can see Yen31 90 If it is okay press UP key...

Page 6: ...DEFAULT SETTING C10 1 Press MENU key for to change CHANNEL SET 2 Press the SET key 3 seconds to see F C1 symbol Press MENU key to change C1 C10 3 Press SET key to see F blinking Press MENU UP DOWN ke...

Page 7: ...U key to scroll through your settings C1 C9 3 After review all the settings press MENU to change SET CHANNEL N CALIBRATION STOP If you do not want to save the calibration data or made mistake during t...

Page 8: ...unit ht shows a t or fitted arou electricity me cable Snap t to be loose the wall or t nd connect ypical instal und the live eter usually the clip shut e fit or be ab the baseboa the Sensor lation wit...

Page 9: ...oom b ment to mo mponents ar y from sourc or repair the mitter which cal environm may break if d g a damaged he equipme and Program specified by gu Seongna 7 1587 hy 0 will work f materials wo 0 succe...

Page 10: ...a 3000 please ation pleas tails of your find that th on repair it for defects afety instruc Korins Inc ou In this e ffect your le Proof of Purc korins kr to nce number s process duct meets t ed and da...

Page 11: ...d by followin T C r 1 a 2 on C r p may be C A i c y s s R o have lost STEP 2 hronizing our OWL clear the g these S TRY THIS Check they replace batte 1 Check Sen and closed SEE STEP 5 2 Check Sen Check...

Page 12: ...T ely s is useful fo FFS AND ctricity at dif or day The ASE SUPP need two ad s is the sam We supply 2 ow k please cons N y rn you when running on This is usefu or to support TIERED TA fferent rates e...

Page 13: ...of the software application supplied with the Display Unit INSTALLING THE SOFTWARE APPLICATION TO DOWNLOAD THE DATA TO PC Please read the User Manual on the Software Application file supplied with SE...

Page 14: ...If y 1588 or e lkaline Batte mainly you are conc mail hyh eries can be cerned or co korins kr used to ope onfused by t erate your D the installatio Display Unit on process p only few da please call c...

Reviews: