background image

Short Manual

Ima

ge ma

y d

Iffer

 

01 / 2013

PIKO Inverter 3.0

Summary of Contents for PIKO Inverter 3.0

Page 1: ...Short Manual Image may differ 01 2013 PIKO Inverter 3 0 ...

Page 2: ...5 min Wait five minutes Discharge time of capacitors 5 4 1 2 3 Types of danger RISK OF DEATH DUE TO ELECTRICAL SHOCK AND DISCHARGE Always de energise the inverter before any work on the system RISK OF DEATH DUE TO ELECTRICAL SHOCK DC lines and inverters carry DC voltage when the solar modules are exposed to light DANGER DUE TO ELECTROMAGNETIC FIELDS Persons with pacemakers metallic implants or hea...

Page 3: ...t the site of the solar energy feed in may only be carried out by qualified electricians expressly authorised licensed by the utility company This includes changes to the factory preset parameters The installer must always observe the regulations of the utility company The utility company s specifications must always be observed when setting the parameters EU Declaration of conformity The company ...

Page 4: ...Freiburg 49 0 477 44 100 www kostal solar electric com XXXXXXXX Hanferstraße 6 D 79108 Freiburg 49 0 477 44 100 www kostal solar electric com 1 Name andress of manufacturer 2 Device type 3 MPP control range 4 Number of feedin phases 5 Maximum AC power 6 Protection type and ambient temperature 7 Requirements conforming to those of the built in and monitoring 8 Maximum voltage DC 9 Maximum DC input ...

Page 5: ... C Air humidity must be between 0 and 95 non condensing Select stable installation location No plasterboard or wooden walls Prevent access by children 200 100 Required cooling space is 200 mm vertical and 100 mm horizontal NH3 Protect from dust contamination and ammonia Ensure easy access and visible display Ensure that people are not disturbed by operating noise Selecting the installation side NO...

Page 6: ...10 11 10 11 Installation 200 200 2 60 60 100 100 70 max 10 2 3 1 Ground connection for France only Cooling space Mounting spaces 3 Nm ...

Page 7: ... elektrického prúdu Menič prepnite do beznapäťovej prevádzky Elektrik çarpması nedeniyle hayati tehlike İnvertörü gerilimsiz hale getirin Κίνδυνος θανάτου από ηλεκτροπληξία Αποσυνδέστε τον αντιστροφέα από το ρεύμα Опасност за живота поради токов удар Изключвайте инвертора от напрежението Livsfara på grund av elektrisk stöt Koppla växelriktaren spänningsfri Zagrożenie życia przez porażenie prądem O...

Page 8: ...14 15 14 15 Connecting AC and DC side Connecting AC side for Italy only L N PE Connecting AC side Connecting DC side ...

Page 9: ...16 17 16 17 Data transfer communication board GSM modem 1 2 3 4 5 1 ...

Page 10: ...Selecting the country of use Note Country setting DE may only be used with inverters installed in PV plants connected to the grid before 31 12 2011 No displacement factor cosφ preset Country setting Austria Select Enter OFF ON 1 2 3 ON 5 Nm ...

Page 11: ...g Austria Country setting Do you really want to apply this country No Yes 1 Select country 2 H Enter 3 Select YES 4 H Enter Menu overview DC and AC DC menu Settings menu AC menu DC menu AC menu DC input 1 U I P Total yield Yield Operation time Phase 1 U I P ...

Page 12: ...mask Router settings External router Router IP RS485 settings Bus termination Bus bias voltage RS485 address Portal configuration Portal code Data export Event messages Immediately mailing On Off Device information SW HW version FW HW UI PAR Serial number Serial number Country setting Country setting Certificate Certificate Certificate index Function test No function Service menu Service code Fact...

Page 13: ...ax input current with parallel connection A Number of DC inputs 1 Number of independent MPP trackers 1 PIKO Unit 3 0 Output side Rated output cos φ 1 Pac r kW 3 Max output apparent power cos φ adj kVA 3 Rated output current A 13 Max output current Iacmax A 13 7 Short circuit current peak A 26 4 Number of feed in phases 1 Grid connection 1 N PE AC 230 V Rated frequency fr Hz 50 Efficiencies Max eff...

Page 14: ...ta Topology without galvanic separation transformerless H Internal protection according to IEC 60529 IP 55 Protection class according to IEC 62103 I Overvoltage category according to IEC 60664 1 Input side PV generator II Overvoltage category according to IEC 60664 1 Output side grid connection III Degree of contamination 3 Environmental category outdoor installation H Environmental category inter...

Page 15: ...rance Belgium Luxembourg 33 1 6138 4117 Greece 30 2310 477 555 Italy 39 011 97 82 420 Spain Portugal2 34 961 824 927 Service Hotline 1 Language German English 2 Language Spanish English 01 2013 edition subject to technical changes and printing errors ...

Reviews: