24
Experts in heating
User Manual
Twin Bio
- PLV 09.13
6. Boiler start-
u
p, operation and stop incl
u
din
g
e
m
er
g
ency stop
6.D. Boiler start-up
The boiler (system) has to be started by an authorized installer
(valid authorized service technician certifi cate issued by
Kostrzewa is required – source: www.kostrzewa.com.pl
‘Service’ tab). Installation and trial run must be recorded in
the Warranty Card.
The user must notify the relevant authorities of a new boiler
installation. The relevant authorities will inform the user on
any further procedures required (e.g. scheduled inspections,
cleaning).
Start-up procedure:
• check system pressure;
• open fl ue gas valve or throttle (if installed);
• check fuel level in the storage hopper (refi ll as required);
• check fuel condition and quality (fuel must not contain
foreign material to avoid damage to the boiler and its
accessories);
• make sure the grate type in the burner is compatible with
the fuel used;
• connect the power supply, set boiler control system in
service mode;
• feed fuel from the storage hopper until it fl ows through the
fl exible duct;
• press the main switch to activate the boiler control system
– Platinum Bio 2 control system operates in automatic
mode;
• when starting from cold (also restarting after maintenance
and cleaning) close the heat transfer to the heating
equipment to reach the dew point faster (see boiler control
system User Manual);
• at operating temperature connect the heating equipment in
sequence;
• visually check the system after a few days of operation
(door and access door, fl ue gas tightness);
• check boiler room ventilation;
• check boiler room lighting (suitable for boiler operation
and repair);
• check access to places which require periodical
maintenance (cleanout, control, storage hopper, burner);
• check leak tightness of hydraulic connection between
the boiler and the central heating system;
• check gas tightness between the boiler and the fl ue
• check if the electrical cables were not damaged in transit.
Installation restrictions
Do not start the boiler if one of the following applies:
• no commissioning of the boiler by relevant authorities was
scheduled (if required);
• incorrect boiler or fuel feed system operation;
• fl ue ducts not vented;
• no water in the boiler;
• incorrect safety valve operation;
• fl ue ducts blocked;
• boiler insulation damaged;
• safety devices and gauges performance issues;
• auxiliary equipment performance issues;
• fi re hazard near the boiler.
6.E. Long boiler downtime
and emergency stop
In the case of long downtime:
• press the main switch, disconnect the boiler pump,
the circulating pump and the burner;
• disconnect the power supply;
CAUTION!
Freeze protection function is not working with
disconnected power supply.
• close all valves;
• drain the boiler and the heating system via a drain valve,
open all cut-off, control and vent valves to avoid freezing;
• bottom door must be open to avoid condensation.
The emergency stop procedure is performed when the boiler
condition or any auxiliary device may cause boiler damage
or hazard to the personnel.
CAUTION!
Rapid boiler cooling may increase the extent
of damage.
Summary of Contents for 4062852055092
Page 1: ...E N G L I S H E N...
Page 2: ......
Page 4: ......
Page 41: ......
Page 42: ......
Page 43: ...D E U T S C H D E...
Page 44: ......
Page 46: ......
Page 83: ......
Page 84: ......
Page 85: ...R U...
Page 86: ......
Page 88: ......
Page 89: ...89 Twin Bio PLV 09 13 VI Twin Bio 1 2 3 4 Twin Bio 5 6 7 8 9 10 11 12 13...
Page 96: ...96 Twin Bio PLV 09 13 4 Twin Bio 4 E A 1595 mm B 88 mm 02 1 2 3 4 1 2 3 4 02 4 H...
Page 97: ...97 Twin Bio PLV 09 13 4 Twin Bio 4 F KOSTRZEWA 286 Platinum Bio DX01 02 Twin Bio...
Page 100: ...100 Twin Bio PLV 09 13 5 5 5 A a A1 mm 500 B1 mm 700 C1 mm 500 H1 mm 2000 g mm 50...
Page 101: ...6 Uruchamianie 101 Twin Bio PLV 09 13 5 B 0 05 50 20x20 2 25 14x14 2 5 C 45 C 40 50 15 C...
Page 102: ...102 Twin Bio PLV 09 13 5 M M M c w u Platinum Bio GSM Twin Bio...
Page 103: ...103 Twin Bio PLV 09 13 5 c w u Platinum Bio M M M GSM Twin Bio...
Page 104: ...104 Twin Bio PLV 09 13 5 M M M Platinum Bio GSM Twin Bio c w u...
Page 107: ...107 Twin Bio PLV 09 13 5 6 5 G 5 H 6 6 A 6 B 5 D 30 C 6 C...
Page 108: ...108 Twin Bio PLV 09 13 6 6 D KOSTRZEWA www kostrzewa com pl ON 6 E...
Page 109: ...109 Twin Bio PLV 09 13 6 7 7 7 A...
Page 110: ...110 Twin Bio PLV 09 13 7 7 B 1 2 3 4 5...
Page 111: ...111 Twin Bio PLV 09 13 7 7 C 1 2 3 4 5...
Page 112: ...112 Twin Bio PLV 09 13 7 7 D 1 2 3 4 5...
Page 113: ...113 Twin Bio PLV 09 13 7 7 E 1 2 3...
Page 114: ...114 Twin Bio PLV 09 13 7 7 F 1 7 G 1 2 3...
Page 116: ...116 Twin Bio PLV 09 13 7 7 J 2 1 2 1 1 2 3 4 5 6 7 K 200 C 1 OFF 2 3 4 5 6 7 8 ON 9 70 C 10...
Page 118: ...118 Twin Bio PLV 09 13 8 8 1 8 A 8 B a 6 STB 12 STB 1 Platinum Bio v02 2 8 C a...
Page 119: ...119 Twin Bio PLV 09 13 8 1 a 2...
Page 120: ...120 Twin Bio PLV 09 13 8 3 4...
Page 121: ...121 Twin Bio PLV 09 13 8 9 24 08 1991 81 11 06 2006 80 06 Platinum Bio 9 60 C...
Page 122: ...122 Twin Bio PLV 09 13 10 11 12 10 11 1 2 3 4 5 6 7 8 9 10 11 12 13 14 12 45 C...
Page 123: ...123 Twin Bio PLV 09 13 13 13 a STB STB...
Page 124: ...124 Twin Bio PLV 09 13 13...
Page 125: ......
Page 126: ......