Failure
Probable cause
Remedy
The display shows ‘burner sensor
short-circuit’ message
• Incorrect burner plate sensor
installation
• Burner plate outlet damage
• Burner duct damage
• Check sensor installation
• Check plate outlet
• Check burner duct
The display shows ‘heat exchanger
overheating’ or ‘STB open’ message
• Incorrect boiler temperature sensor
installation
• Boiler temperature sensor failure
• No heat removal
• Safety temperature limiter (STB)
failure
• Check correct sensor position
• Check the sensor connection in the
control
• Boiler pump failure
• Control replacement / repair
The display shows ‘burner overheating’
message
• Incorrect sensor installation
• Feeder sensor failure
• Fouled burner grate – sinter
on the grate
• Check sensor installation
• Replace feeder sensor
• Clean burner grate
No indications on the display
• No power supply
• Incorrect connection of control
system plugs and cables
• High control humidity
• Display failure
• Check power supply connections
• Check control plugs and connectors
• Control replacement / repair
Control system button(s) not working
• Control panel failure
• Control system repair
The feed screw does not turn, despite
being signalled as functioning
• No power to gear motor
• Wrong wiring of power cables
• The feeder is blocked
• Gear motor is faulty
• Control module is faulty
• Check control plugs and connectors
• Check the connection of the gear
motor to the screw shaft
• Check if the feeder duct is not
blocked and that the screw shaft can
rotate freely in the duct
No air intake despite the fan being
signalled as functioning
• No power to the fan
• Fan is faulty
• Control module is faulty
• Check fan plugs and cables
(with connectors)
• Replace fan
• Replace control module
Summary of Contents for 4062852055092
Page 1: ...E N G L I S H E N...
Page 2: ......
Page 4: ......
Page 41: ......
Page 42: ......
Page 43: ...D E U T S C H D E...
Page 44: ......
Page 46: ......
Page 83: ......
Page 84: ......
Page 85: ...R U...
Page 86: ......
Page 88: ......
Page 89: ...89 Twin Bio PLV 09 13 VI Twin Bio 1 2 3 4 Twin Bio 5 6 7 8 9 10 11 12 13...
Page 96: ...96 Twin Bio PLV 09 13 4 Twin Bio 4 E A 1595 mm B 88 mm 02 1 2 3 4 1 2 3 4 02 4 H...
Page 97: ...97 Twin Bio PLV 09 13 4 Twin Bio 4 F KOSTRZEWA 286 Platinum Bio DX01 02 Twin Bio...
Page 100: ...100 Twin Bio PLV 09 13 5 5 5 A a A1 mm 500 B1 mm 700 C1 mm 500 H1 mm 2000 g mm 50...
Page 101: ...6 Uruchamianie 101 Twin Bio PLV 09 13 5 B 0 05 50 20x20 2 25 14x14 2 5 C 45 C 40 50 15 C...
Page 102: ...102 Twin Bio PLV 09 13 5 M M M c w u Platinum Bio GSM Twin Bio...
Page 103: ...103 Twin Bio PLV 09 13 5 c w u Platinum Bio M M M GSM Twin Bio...
Page 104: ...104 Twin Bio PLV 09 13 5 M M M Platinum Bio GSM Twin Bio c w u...
Page 107: ...107 Twin Bio PLV 09 13 5 6 5 G 5 H 6 6 A 6 B 5 D 30 C 6 C...
Page 108: ...108 Twin Bio PLV 09 13 6 6 D KOSTRZEWA www kostrzewa com pl ON 6 E...
Page 109: ...109 Twin Bio PLV 09 13 6 7 7 7 A...
Page 110: ...110 Twin Bio PLV 09 13 7 7 B 1 2 3 4 5...
Page 111: ...111 Twin Bio PLV 09 13 7 7 C 1 2 3 4 5...
Page 112: ...112 Twin Bio PLV 09 13 7 7 D 1 2 3 4 5...
Page 113: ...113 Twin Bio PLV 09 13 7 7 E 1 2 3...
Page 114: ...114 Twin Bio PLV 09 13 7 7 F 1 7 G 1 2 3...
Page 116: ...116 Twin Bio PLV 09 13 7 7 J 2 1 2 1 1 2 3 4 5 6 7 K 200 C 1 OFF 2 3 4 5 6 7 8 ON 9 70 C 10...
Page 118: ...118 Twin Bio PLV 09 13 8 8 1 8 A 8 B a 6 STB 12 STB 1 Platinum Bio v02 2 8 C a...
Page 119: ...119 Twin Bio PLV 09 13 8 1 a 2...
Page 120: ...120 Twin Bio PLV 09 13 8 3 4...
Page 121: ...121 Twin Bio PLV 09 13 8 9 24 08 1991 81 11 06 2006 80 06 Platinum Bio 9 60 C...
Page 122: ...122 Twin Bio PLV 09 13 10 11 12 10 11 1 2 3 4 5 6 7 8 9 10 11 12 13 14 12 45 C...
Page 123: ...123 Twin Bio PLV 09 13 13 13 a STB STB...
Page 124: ...124 Twin Bio PLV 09 13 13...
Page 125: ......
Page 126: ......