background image

 

 

 

 
 

 

Page 3

 

INTRODUCTION 

Congratulations on your purchase of a biomassfired heating system from KOZLUSAN HEATING 

SYSTEMS. 

With proper installation and maintenance, your heating system will provide years of non-polluting, low cost 

heat for your home.  

To insure correct installation and safe operation of your KOZLUSAN biomass heating system, you should: 

 

Hire a licensed heating contractor

 to install the biomass heating system and integrate it with your 

heating system. This contractor should have experience with installation and operation of gas, oil, 

and solid fuel heating appliances and be familiar with local building codes, fire codes and other 

regulations.  

 

Read this manual

 and learn how to safely operate and maintain your KOZLUSAN biomass heating 

system. 

 

The assembling and start up (setting) of KOZLUSAN biomass boiler has to be carried out by 

our own customer service or by authorized qualified technicians. 

 

 

Do not use any other fuels than specified below: 

 

Ö-Norm M 7135 

 

DIN-PLUS Norm 

 

SWISSPELLET 

 

Diameter: 6 mm   Length: 5-30 mm (20% - 45 mm) 

Only this way low-emission, economical and reliable operation can be guaranteed. Any disregard of 

these requisites leads to immediate expiry of warranty. 

 

The pellets must be stored in dry conditions to enable them to be transported without problems and 

to achieve trouble-free operation with optimum combustion combined with the greatest possible 

efficiency. 

 

We do not assume any liability for unauthorized technical modifications, and resulting damages are 

not covered by warranty. 

 

Operational procedures or alterations of any sort, carried out by unauthorized persons, as well as 

disregarding the general guidelines and the indicated safety instructions as specified here, result in 

immediate termination of all warranty claims. 

 

Please read the safety instructions below before operating the system. Disregarding the safety 

instructions may lead to injuries, perilous situations or damage the pellet boiler. 

Summary of Contents for SLIMPEL

Page 1: ...n Road Dromore Craigavon Co Down Northern Ireland BT25 1HL Tel 44 0 28 38 820 043 Fax 44 0 28 38 820 987 Email info geeltd org Owner s Manual MODEL SLIMPEL BE SURE TO READ THIS MANUAL AND KEEP IT NEAR...

Page 2: ...NTS Section Page Introduction 3 Safety instructions 4 How to biomass system works 6 Specifications 8 Installation 12 Operating the Heating system 15 Maintenance Overview 16 Troubleshooting 19 Installa...

Page 3: ...or by authorized qualified technicians Do not use any other fuels than specified below Norm M 7135 DIN PLUS Norm SWISSPELLET Diameter 6 mm Length 5 30 mm 20 45 mm Only this way low emission economical...

Page 4: ...nce work Wait until the pellet boiler has cooled down check the temperature on the display The boiler needs to be switched off before carrying out the cleaning of the chimney Wait until the pellets ha...

Page 5: ...boiler Annual control of safety devices by a specialist Regular control of expansion tank by a specialist Regular control of pellet feeding devices automatic ignition devices and feeding features Plea...

Page 6: ...Biomass heating system 1 Fuel is fed from the fuel store via an auger The fuel is poured from the top into the cylindrical burn pot to maintain a physical separation between the fuel store and the fue...

Page 7: ...e burn rate of the heating system in conjunction with the flue gas temperature sensor that measure the temperature in the flue This information is used to determine the amount of air and fuel being us...

Page 8: ...Page 8 SPECIFICATIONS SLIMPEL 25...

Page 9: ...Page 9 SLIMPEL 40...

Page 10: ...Page 10 AIR ELIMINATOR VALVE BLOW OFF...

Page 11: ...re bar 3 3 Test Pressure 4 3 4 3 Max Suction Flow Rate Of Flue m h 60 100 Exhaust Fan sucktion pressure at full load pascal 7 10 Dimensions Total Weight kg 300 380 Water Content lt 50 90 Bunker Capaci...

Page 12: ...s all draw air from the room Be certain there is an adequate source of fresh air to offset these demands or you may create negative pressure in the room and starve the heating system of combustion and...

Page 13: ...ned it is suitable for use with a residential heating appliance that burns solid fuel 2 The chimney or flue should be at least 3 4 m tall and sized correctly for the KOZLUSAN Heating System model inst...

Page 14: ...Page 14 This page intentionally left blank...

Page 15: ...urning fuel in the burnpot 7 DO NOT throw fuel into the burnpot via the access door 8 Keep the access door closed tight except when tending the burnpot 9 Keep the heating system area clear of combusti...

Page 16: ...een 1 and 2 bar if too low top up system with more water 6 DO NOT clean heating system surfaces when the unit is hot Wait until the unit cools and then clean with soap and water ATTENTION This work ma...

Page 17: ...skets on the combustion chamber door and ash box Operational test of the heat exchanger cleaning Cleaning of the exhaust sensor Test the igniter tube for residue Test upper and lower parts of the burn...

Page 18: ...unction control using caulking strip newly caulk the boiler cover and reassemble Cleaning of secondary air channels in burnpot and the base of burnpot Detach the hopper tank from the boiler firstly Th...

Page 19: ...temperature sensor Inform customer service Error Back burning to auger The temperature of the auger exceeded the limit thermostat s value Back burning to auger Defective back burning detection thermo...

Page 20: ...do not work Heating system is slow to heat up The boiler is on utility water operation mode Change operation mode Hydraulic problem Contact installer Altered heating curve Adjust Heating circuit pump...

Page 21: ...Page 21...

Reviews: