54
Step 3
Move the base braces in such a way
that the 2 metre vertical frames can be
attached onto them from above and
lock the connections with locking pins.
Tighten the nuts on the base braces.
Next, level the scaffold both diagonally
and longitudinally using a spirit level
and by adjusting the height-adjustable
castors.