59
Step 9
Next, have the 1 metre vertical frames
passed up to you and suspend them
from the pipe couplings on the 2 metre
vertical frames as shown in the image
for greater ease.
Next, insert the platform into the top
rungs of the vertical frame through the
openings provided for this purpose.