79
– Scaffold components must be laid down flat and secured in such a way for transport
as to prevent them from becoming damaged through sliding out of place, from
collisions or falling down etc.
– The scaffold tower components can be cleaned with water and a conventional
cleaning agent. Paint stains can be removed using turpentine.
Caution
Do not allow cleaning agents to find their way into the ground. Cleaning agents must
be disposed of in accordance with the relevant environmental regulations.