background image

KREMLIN REXSON

N° : 578.001.130-UK-1103

2. HANDLING

Check the weight and the dimensions of the equipment

(

refer to 'Technical features' section of the instruction manual

If weight and dimensions are too important, the unloading must be carried out by means of a forklift or
any other appropriate means with a qualified personnal and in a clear horizontal area to prevent from
risks of damage injury or an accident.

The centre of gravity is not in the centre of the machine : carry out by hand a stability-test after having
lifted the whole at 10 cm / 3.937" maximum.

After the unloading, the handling of the whole (eg: elevator pump) is carried out by means of a pallet
truck taking the bottom part of the frame.

Remark : Each pump motor is fitted with a ring. The ring is designed for the hoisting of one
pump and can not be used for the handling of the complete machine.

3. STORING

Storing before installation :
-

Storing ambient temperature : 0 / +50 °C / 0 / +122°F

-

Protect the whole against dust, water trickling, dampness and shocks.

Storing after installation :

-

Operating temperature : +15 / +35 °C / +59 / +138.2° F

-

Protect the whole against dust, water tricling, dampness and shocks.

4. INSTALLATION OF THE EQUIPMENT

The machine is installed on a stable horizontal floor (for eg a concrete flag).

To avoid risks caused by static electricity, the equipment as well as its components
must be grounded.

For the pumping equipments

(pumps, pneumatic rams, frame…), a section wire of 2.5

mm²

is fixed on the material. Use this wire to connect the material to “the general

ground”. In case of severe environments (mechanical protection of the wire of earthing
insufficient, vibrations, mobile material…) where function damages at the ground are
probable, the user have to replace the provided wire of 2.5 mm² by a device more
adapted to its environment (wire with a more important section, bonding strip, fixing by
thimble with eyelet…),

The continuity of the ground must be controlled by a qualified electrician. If the continuity
of the ground is not ensured, check the terminal, the wire and the earthing point.

Never

use the material without have solved this problem.

In the severe cases of environments (mechanical protection of the wire of earthing
insufficient, vibrations, mobile material…) where damages of the function put at the
ground are probable, the user will have to replace the wire of 2.5 mm ² provided, by a
device more adapted to its environment (wire of more important section, bonding strip,
fixing by thimble with eyelet…),

The gun

must be 'grounded' via a material hose or an air hose. In case of spraying by

means of a gun with cup, the air hose must be conductive,

The materials to be painted

must also be grounded.

All the materials situated in the working area shall be grounded.

Summary of Contents for 151.110.600

Page 1: ... HINWEIS Vor Lagerung Installation oder Inbetriebnahme des Geräts bitte sämtliche Dokumente sorgfältig lesen Einsatz nur von geschultem Personal IMPORTANTE Lea con atención todos los documentos antes de almacenar instalar o poner en marcha el equipo uso exclusivamente profesional PHOTOS ET ILLUSTRATIONS NON CONTRACTUELLES MATERIELS SUJETS A MODIFICATION S SANS PREAVIS THE PICTURES AND DRAWINGS ARE...

Page 2: ...t up please read and clearly understand all the documents relating to this equipment professional use only THE PICTURES AND DRAWINGS ARE NON CONTRACTUAL WE RESERVE THE RIGHT TO MAKE CHANGES WITHOUT PRIOR NOTICE KREMLIN REXSON l 150 avenue de Stalingrad 93 245 STAINS CEDEX France 33 0 1 49 40 25 25 Fax 33 0 1 48 26 07 16 www kremlin rexson com ...

Page 3: ...odify the equipment The parts and accessories supplied must be regularly inspected Defective or worn parts must be replaced Guards motor cover coupling shields connectors have been designed for a safe use of the equipment The manufacturer will not be held responsible for bodily injury or failure and or property damage due to destruction the overshadowing or the partial or total removal of the guar...

Page 4: ...AZARDS Toxic products or vapours can cause severe injury not only though contact with the body but also if the products are ingested or inhaled It is imperative to know the material products and their risks notified or hazardous materials must be stored in accordance with the regulations the material must be stored in an appropriate container never place materials in a container where there is a r...

Page 5: ... moving parts or hot surfaces Never expose product hoses to temperature higher than 60 C 140 F or lower than 0 C 32 F Never pull or use the hoses to move the equipment Tighten all fittings as well as the hoses before operating the equipment Check the hoses regularly change them if they are damaged Never exceed the working pressure WP indicated on the hose USED PRODUCTS Considering the wide variety...

Page 6: ...void risks caused by static electricity the equipment as well as its components must be grounded For the pumping equipments pumps pneumatic rams frame a section wire of 2 5 mm is fixed on the material Use this wire to connect the material to the general ground In case of severe environments mechanical protection of the wire of earthing insufficient vibrations mobile material where function damages...

Page 7: ...roved drums and grounded Use only grounded metals containers for the use of cleaning solvents Cardboard and paper are prohibited 5 MARKING OF THE EQUIPMENT Each equipment has a marking plate The plate consists of the name of the manufacturer the equipment part number and important information for correct use of the equipment air pressure electric power ...

Page 8: ... Before assembly and start up please read and clearly understand all the documents relating to the equipment professional use only THE PICTURES AND DRAWINGS ARE NOT CONTRACTUAL WE RESERVE THE RIGHT TO MAKE CHANGES WITHOUT PRIOR NOTICE KREMLIN REXSON l 150 avenue de Stalingrad 93 245 STAINS CEDEX France 33 0 1 49 40 25 25 Fax 33 0 1 48 26 07 16 www kremlin rexson com ...

Page 9: ...on tool Its correct functioning requires regular maintenance carried out with care When it is carried out directly after use the cleaning of the gun is faster and easier For a correct operating of the gun replace seals every 6 months Never use metallic brushes files or pliers when dismantling the gun SHORT DURATION SHUTDOWN Leave the equipment as it is if the material used makes it possible In any...

Page 10: ... Before assembly and start up please read and clearly understand all the documents relating to the equipment professional use only THE PICTURES AND DRAWINGS ARE NOT CONTRACTUAL WE RESERVE THE RIGHT TO MAKE CHANGES WITHOUT PRIOR NOTICE KREMLIN REXSON l 150 avenue de Stalingrad 93 245 STAINS CEDEX France 33 0 1 49 40 25 25 Fax 33 0 1 48 26 07 16 www kremlin rexson com ...

Page 11: ...le fittings etc Fluid leak in front of the gun Dirt in the material Trigger the gun 3 or 4 times or clean the seat Bad tightness between the ball and its seat Clean the seat or replace the needle assembly model 250 bar 3627 psi the ball model 500 bar 7251 5 psi and the seat Ball or ball seat misplaced Replace the needle assembly model 250 bar 3627 psi the ball model 500 bar 7251 5 psi and the ball...

Page 12: ...IEZAS DE REPUESTO PISTOLET MANUEL D EXTRUSION EXTRUSION MANUAL SPRAY GUN MANUELLE EXTRUSIONSPISTOLE PISTOLA MANUAL DE EXTRUSIÓN 500 BAR 7251 5 PSI NOTICE ORIGINALE TRANSLATION OF THE ORIGINAL MANUAL ÜBERSETZUNG DER ORIGINAL BEDIENUNGSANLEITUNG TRADUCCIÓN DEL LIBRO ORIGINAL 151 110 600 ...

Page 13: ...S Joint d étanchéité x3 Tightness seal x3 Dichtungsscheiben 3x Junta de estanqueidad x3 1 9 NC NS Rondelle Washer Scheibe Arandela 1 10 NC NS Butée Retainer Anschlag Tope 1 11 NC NS Piston assemblé Piston assembly Kolben kpl Pistón equipado 1 12 NC NS Vis Screw Schraube Tornillo 1 13 NC NS Ecrou Nut Mutter Tuerca 1 14 NC NS Axe de gâchette Trigger spindle Abzugshebelachse Eje de gatillo 1 15 NC NS...

Page 14: ... fitting MF 3 8 NPT Drehgelenk IG AG 3 8 NPT Racor giratorio HM 3 8 NPT 1 25 905 160 206 Raccord M 3 8 NPT M 3 4 JIC Fitting M 3 8 NPT M 3 4 JIC Anschluss AG 3 8 NPT AG 3 4 JIC Racor M 3 8 NPT M 3 4 JIC 1 151 110 695 Kit de maintenance ind 3 4 5 6 7 11 16 Servicing kit ind 3 4 5 6 7 11 16 Servicekit Pos 3 4 5 6 7 11 16 Bolsa de reparación índ 3 4 5 6 7 11 16 1 Pièces de maintenance préconisées Pre...

Reviews: