KREMLIN REXSON
Page 13
Manual : 573.199.112
CONNECTION OF THE CONTROL BOX AND OF THE FLUID FRAME
The PU 3000 must be connected to a dry
and clean compressed air network (minimum
4 bar / 58 psi) and to a single phase electric
supply (115 V / 230V) connected to an
isolating switch. The network ground will be
connected in the control box on a connect
provided.
Before connecting the PU 3000, be
certain the mains voltage is the same as
the
one
of
the
machine
(230
V).
If no, open the electric box removing the
protective housing and move the jumper
(230V
115V).
Install a fluid hose, model HP (high pressure) between the mixer outlet and the spray gun (
act
according to the pressures the pumps supply).
Connect the air equipment of the PU 3000 to the pneumatic network with a conductive hose (minimum
16 mm / 5/8 dia).
Nota : these hoses are not supplied in the standard version.
The air connection of the machine is Female 3/4 BSP (air inlet valve).
The connection between the control box and the electrovalves located on the frame, is carried out via
cable, length : 8 m / 26.2".
6. OPERATING
DRIVING FROM THE MACHINE
SCREEN
Different menus and information relating to the machine are displayed on the alphanumeric screen.
KEYBOARD
ESC
That key enables the user to quit the menus or the different modes (production,
flushing, parameters).
OK
That key enables the user to enter in the different menus or to validate a value of
parameter.
▲
That key enables the user to shift from a menu to another and to increase the value
of a parameter during modifications of value.
▼
That key enables the user to shift from a menu to another and to decrease the value
of a parameter during modifications of value.
The keyboard is controlled thanks to a magnet provided with the machine. That control mode enables the
user to drive the machine inside the booth if the box is installed behind the booth glass panel. This
technology enables the operator to save time and to carry out his work from the place application.
SWITCHING ON THE MACHINE
The placing of the system into operation requires that the BASE, CATALYST and
SOLVENT drums are full enough to ensure the production.
Connect the gun before placing the system into operation.