BM 70M-EEx/ BM 70Mi-EEx
15
Assembly screws (M) for signal converter:
M
M
Purge connection
(optional)
Purge
connection
(optional)
Sensor connection
(optional)
Sensor connection
(optional)
H
H
O-Ring
O-Ring
Signal converter
Flange system
SA
Flange system
V96
9.2
Replacement of complete device
The requirements described in Sect. 9.1 also apply in this instance.
In addition, make sure that all process connections and the tank are non-pressurized.
Caution:
On pressurized tanks, do not remove the 4 screws (H) connecting the wave
guide window to the tank mounting flange (refer to diagram in Sec. 9.1).
DANGER TO LIFE!
In connection with environmentally critical products, carefully decontaminate the wetted parts of
the flange system after dismantling.
10 Maintenance
Service
Maintenance work of a safety-relevant nature within the meaning of explosion protection may only
be carried out by the manufacturer, his authorized representative or under the supervision of
authorized inspectors.
Summary of Contents for BM 70 M Series
Page 75: ...BM 70 M 75 10 Certificates and approvals 10 1 Declaration of Conformity...
Page 83: ...BM 70 M 83 Annex C Spare parts...
Page 84: ...84 BM 70 M...
Page 85: ...BM 70 M 85...
Page 102: ...16 BM 70M EEx BM 70Mi EEx 11 Approvals...
Page 103: ...BM 70M EEx BM 70Mi EEx 17...
Page 104: ...18 BM 70M EEx BM 70Mi EEx...
Page 105: ...BM 70M EEx BM 70Mi EEx 19...
Page 106: ...20 BM 70M EEx BM 70Mi EEx...
Page 107: ...BM 70M EEx BM 70Mi EEx 21...
Page 108: ...22 BM 70M EEx BM 70Mi EEx...