3
INSTALLATION
18
VA FLOWMETERS
www.krohne.com
09/2022 - 4000419908 - AD VA Mech Ex Gb-Db R08 en
Flammable products
Observe the safety instructions when operating with flammable products.
For further information refer to
Flammable products on page 11.
Measuring units with titanium components
Observe the information regarding installation and safe operation.
For further information refer to
Mounting on page 17 and refer to Operation on page 21.
Unpainted indicators
Unpainted DK3x..HT indicators must not be used in corrosive environments.
3.3 Grounding and equipotential bonding
If the device is not sufficiently electrostatically grounded via the process pipes, an additional
ground connection must be established using the ground terminal
①
or
②
.
The location of the ground terminal is shown below according to type. This connection only
ensures electrostatic grounding of the device and does not meet the requirements for
equipotential bonding.
Figure 3-1: Ground terminal for DK3. mechanical flowmeter or DK32 with ESK3x transmitter
Figure 3-2: Ground terminal for H250/M40
Summary of Contents for DK 46
Page 25: ...NOTES 6 25 VA FLOWMETERS www krohne com 09 2022 4000419908 AD VA Mech Ex Gb Db R08 en...
Page 26: ...6 NOTES 26 VA FLOWMETERS www krohne com 09 2022 4000419908 AD VA Mech Ex Gb Db R08 en...
Page 27: ...NOTES 6 27 VA FLOWMETERS www krohne com 09 2022 4000419908 AD VA Mech Ex Gb Db R08 en...