Installation requirements
•
the stilling well must be electrically conductive
•
stilling well wall must be straight and smooth (surface roughness ±0.1 mm or 0.004")
•
no abrupt changes in well diameter greater than 1 mm or 0.04"
•
drill a pressure equalization hole in the stilling well above the maximum product level
•
an opening in the base is normally sufficient for one-liquid applications
•
if foam is not present, drill other holes along the length of the stilling well: this helps the product to
circulate, especially where there is more than one liquid. These must be small, widely spaced and
deburred
•
probe counterweights in stilling wells: check that there is sufficient (but not too much) play between the
counterweight and the inside wall of the stilling well for the product to circulate
Summary of Contents for optiplex 1300 c
Page 1: ......
Page 49: ...Handbook OPTIFLEX 1300 C 49 OPTIFLEX 1300 C 1 Volume measurement of liquids...
Page 50: ...Handbook OPTIFLEX 1300 C OPTIFLEX 1300 C 50 2 Volume measurement of solids...
Page 51: ...Handbook OPTIFLEX 1300 C 51 OPTIFLEX 1300 C 3 Mass measurement of liquids or solids...
Page 62: ...Handbook OPTIFLEX 1300 C OPTIFLEX 1300 C 62 Finding the advanced setup menu...
Page 95: ...Handbook OPTIFLEX 1300 C 95 OPTIFLEX 1300 C Note...