9
English
2 English
2.1 Basic instructions
Mobile heating unit HM200 are the result of
tenth of years of experience and intensif deve-
lopment work. We are convinced of handing you
over a high-quality product.
Nevertheless, the heater must be installed, set
into operation and tested by measurings corre-
sponding to the respective circumstances by a
specialist.
Read the instruction handbook carefully, prior
to installing and comissioning the heater.
Attention
All details stated, refering to installation and
setting into operation must be effected and
observed carefully in order to grant an economic
operation free of malfunctions.
The space heaters are proved in accordance to
EN1020 and must be equipped by oil burners,
proved in accordance with EN267 or gas burners
in accordance with EN676 with an automatic
control box, which is permitted for this space
heater.
Technical changes in the sense of product
improvement reserved.
2.2 Designated use
Everywhere, where heat is needed or to keep
free of icing or for an agreable climate Kroll mobil
heating units are the ideal partners:
• Majors construction sites
• Tents
• Storage halls
• Supplementary or intermediary heater
• as replacement in case of break-down of
the mobile heating unit
Inappropriate use
These space heaters are not suitable for
household use and must be used only by
persons who have been instructed about their
operation.
Attention
Responsibility
In order to qualify for the guarantee, the device
must be installed and commissioned by a
specialist. The settings are to be recorded in a
measurement certificate.
Please fill out all the points of the guarantee
form correctly, sign, and send it to Kroll. Please
note that in case of missing measuring values no
guarantee certificate will be issued.
The guarantee will only be granted if a regular
servicing is carried out at least once a year and
in accordance with the Kroll operating instruc-
tions. The results must be recorded in the appli-
cable measurement certificates.
The usual guarantee period granted on our
device covers 24 months after delivery - the date
of the invoice being decisive.
The fan must cool the combustion chamber
and heat exchanger -Danger of over-heating!
Do not switch off electrical supply and master
switch until the space heater has cooled down.
Attention
Non-compliance invalides the factory
guarantee
It is strictly prohibited to add any petrol.
If the pump pressure is set at a higher value
in order to get the heater started up in case of
low ambient temperatures, the device will be
overheated as soon as the ambient and oil tem-
peratures are increasing. This will entail cases of
damage, excluding any warranties.
In case of deflagrations, an analysis of the fuel oil
used should be made available, and the installa-
tion of the device should be verified by an expert.
Any warranties will equally lapse if EL fuel oil
according to the DIN Standard No. 51 603-1 is
used at temperatures below + 4° C or if winter
diesel is used below stipulated temperatures.
Do not use any additives.
Damage during transport
Transport damages must be noted on the for-
warders receipt and signed by the driver. Your
dealer must be notified of any technical damage
before the appliance is assembled and set into
operation. The heater is only be started up after
competent repair.
Any cases of consequential damage due to the
failure of the device during operation will be
excluded from liability.
Attention
Summary of Contents for HM100
Page 2: ......
Page 27: ...25 Einzelteile Component parts Nomenclature 6 Einzelteile Component parts Nomenclature...
Page 35: ...33...