background image

FBR 1, FBR 2 · Edition 07.10

6

 Functioning

3 .1 Electrical connection diagrams

FBR 1 with K1

3

2

1

FBR 1

K1

10

9

8

7

6

5

4

3

2

1

20

19

18

17

16

15

14

13

12

11

FBR 1 with E25

3

2

1

FBR 1

E25

10

9

8

7

6

5

4

3

2

1

20

19

18

17

16

15

14

13

12

11

FBR 1 and/or FBR 2 with E8 and Lago E8

3

2

1

FBR 1/FBR 2

3

2

1

E8

5

4

3

2

1

10

9

8

7

6

5

4

3

2

1

2

1

II

VI

IV

1

2

3

4

5

6

7

8

9

10

1

2

3

4

1

2

3

1

2

1

2

1

2

IX

III

VIII V

I

VII

FBR 1/FBR 2

FBR 2 with Merlin

3

2

1

FBR 2

Merlin

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

GND

38

37

36

35

34

33

32

31

30

29

28

27

26

25

24

23

22

21

20

3

2

1

FBR 2

FBR 2 with Lago 0321 and Lago 0101/1001

3

2

1

FBR 2

Lago

11

12

13

14

15

16

17

18

19

20

21

22

10

9

8

7

6

5

4

3

2

1

Summary of Contents for FBR 1

Page 1: ...FBR 1 FBR 2 It is distinguished by a timeless design which integrates seamlessly with your living space Easy to fit due to removable control unit Easy setting of operating mode and room temperature al...

Page 2: ...te control units FBR 1 FBR 2 1 Table of contents 2 1 Application 3 2 Certification 4 3 Functioning 5 3 1 Electrical connection diagrams 6 4 Project planning information 7 4 1 Electrical connection 7 4...

Page 3: ...the K1 E8 or E25 heating controller The FBR 2 is directly connected to the FBR input on the E8 Merlin or Lago heating controller see page 6 Electrical connection diagrams With the FBR 1 and FBR 2 remo...

Page 4: ...FBR 1 FBR 2 Edition 07 10 4 2 Certification EMC conditions in accordance with EN 60730 1 and EN 60730 2 9 The devices are in compliance with the EMC Directive and the Low Voltage Directive...

Page 5: ...temperature day mode with comfort temperature automatic mode according to time program When the FBR 2 is in automatic mode it also provides the option to select two time programs and summer mode with...

Page 6: ...FBR 2 with E8 and Lago E8 3 2 1 FBR 1 FBR 2 3 2 1 E8 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1 2 1 II VI IV 1 2 3 4 5 6 7 8 9 10 1 2 3 4 1 2 3 1 2 1 2 1 2 IX III VIII V I VII FBR 1 FBR 2 FBR 2 with Merlin 3 2 1...

Page 7: ...es the desired room temperature to increase by 0 2 C and the room temperature measurement to increase by 0 5 C Example FBR 2 A connecting lead with 0 25 mm2 telephone line and a length of 10 m causes...

Page 8: ...class III according to EN 60730 Ambient temperature During operation 0 to 50 C in storage 20 to 60 C Permissible relative humidity 95 RH not condensing Room sensor FBR 1 1 k PTC measurement resistor...

Page 9: ...product To choose a product Planning To look for information My scope of functions Technical department Sales No answer Remarks Adobe Reader 7 or higher required www adobe com Elster GmbH Postfach 280...

Reviews: