FCU 500, FCU 505 · Edition 02.17
21
Function
3 .2 .3 FCU 505 . .F1, FCU 505 . .F2
Example of application, see page 13 (Furnace and
Switch on the FCU
▼
In the event of fault signal: reset
▼
00
Start-up position/standby
▼
H0
Start-up with
ϑ
signal
▼
Switch-on delay time t
E
running (parameter 63)
Safety interlocks check
▼
01
Fan run-up time t
GV
running (parameter 30)
Pre-purge starts
▼
A
Actuator moves to the position for maximum capacity
▼
P1
FCU 500 pre-purge time t
PV
running
Tightness test (if equipped with TC)
▼
A
Actuator moves to the position for ignition capacity
▼
H8
Controller enabler signal delay time t
RF
running
▼
08
Operation/controller enable