FCU 500, FCU 505 · Edition 02.17
48
Valve proving system
7 .2 Test period t
P
The test period for the tightness test varies depending
on the selected function (parameter 53).
7 .2 .1 For one test volume V
p1
between 2 gas solenoid
valves
PZL
PZH
FCU 500..C1
µC
P
49
13
14
50
45
45
47
58
48
p
u
/2
TC
PZ
PZL
PDZ
M
>750°
ϑ
1
2
3
p
u
/2
PZ
V
p1
V1
V2
p
u
p
z
p
d
The test period t
P
is calculated from:
– Opening times t
L
for V1 and V2,
– Measurement times t
M
for V1 and V2.
t
P
[s] = 2 x t
L
+ 2 x t
M
7 .2 .2 For one test volume V
p1
for system tightness
PZL
PZH
FCU 500..C1
µC
P
49
15
13
14
50
45
47
58
48
p
u
/2
TC
PZ
PZL
PDZ
M
>750°
ϑ
1
2
3
p
u
/2
PZ
V
p1
V1
V3
p
u
p
z
The test period t
P
is calculated from:
– Opening times t
L
for V1 and V3,
– Measurement times t
M
for V1 and V3.
t
P
[s] = 2 x t
L
+ 2 x t
M