A - 9
Appendix
A1.3.2 Installing the ropes
•
Starting from the back, guide the rope (2) through the
eyes (1) of the tubular hoops.
•
From below, guide the rope through the eyelets in the
tarpaulin and place it on the hooks on the front panel.
The two outer ropes are also threaded
through the two side eyelets in the
tarpaulin.
•
Lay the tension ropes (3) and (4) round the front tubular
hoop.
•
Hook the tension rope hooks (3) and (4) in the eyelets
of the tarpaulin.
KLW07191
3
4
5
2
1
Summary of Contents for 4XL-RGD
Page 4: ...Foreword ...
Page 10: ...I 4 General information ...
Page 15: ...II 5 Safety ...
Page 22: ...II 12 Safety ...
Page 64: ...VI 18 Maintenance ...
Page 66: ...VII 2 Overwintering ...
Page 68: ...VIII 2 Recommissioning ...
Page 70: ...IX 2 Faults causes and removal ...
Page 80: ...A 10 Appendix Operator friendlyoperation A2 Electrical circuit diagram ...
Page 81: ...A 11 Appendix ...
Page 82: ...A 12 Appendix ...
Page 83: ...A 13 Appendix ...