X - 24
Mowers
10.8.2 Installing the auger-type cross
conveyor
Install the retaining chains
Attach the retaining chains (1) to the ring bolts (2) and
(3) of the auger-type cross conveyor.
Only use appropriate lifting devices to lift
the auger-type cross conveyor (weight of
the auger-type cross conveyor = approx.
300 kg).
Slowly lower the auger-type cross conveyor (1) onto the
mower (2).
At the end of the lowering process be sure to introduce
the auger-type cross conveyor into the guide pins (1)
and (2).
The surfaces (3) and (4) must be level with
each other at either side of the mower.
Locking the clamping levers
Lock the clamping levers (1) and (2) located at the inner
side of mower (3).
Be sure the clamping levers (1) and (2) are
under tension when being locked.
Retighten as required.
4
1
BMS01210
3
2
BMS02280
4
3
2
1
BMS01270
1
3
2
BMS01140
1
2
Summary of Contents for Big M II
Page 2: ......
Page 4: ...Vorwort Notizen ...
Page 28: ...II 14 Safety ...
Page 35: ...III 7 Controls 3 7 Roof Console BMII 192 A B A Compartment B Airconditioning heating ...
Page 42: ...III 14 Controls ...
Page 64: ...VI 8 Cabin ...
Page 68: ...VII 4 Check before Start up ...
Page 74: ...VIII 6 Engine Operation ...
Page 100: ...X 20 Mowers 10 6 Front Mower Lubrication Chart EC 087 1 ...
Page 136: ...XII 16 Maintenance Electrical System ...
Page 148: ...XV 4 Belt Drive ...
Page 154: ...A 2 Appendix ...
Page 155: ...A 3 Appendix ...