X - 25
Mowers
Tensioning the V-belts
Use the mounting lever (1) supplied in
the on-board tool box.
Use mounting lever (1) to raise idler pulley (2).
Place V-belt (3) onto pulley (4).
Lower idler pulley (2) slowly and withdraw mounting
lever (1).
With V-belt under tension dimension X
must be equal to approx. 5 mm.
Installing the guard
Install guard (1) onto mower (3) using the hex. head
bolts (2).
x
BMS01312
4
2
1
3
BMS01340
1
2
3
Also lock the outer clamping levers (1) and (2).
Be sure the clamping levers (1) and (2) are
under tension when being locked.
Retighten as required.
BMS01290
1
2
Summary of Contents for Big M II
Page 2: ......
Page 4: ...Vorwort Notizen ...
Page 28: ...II 14 Safety ...
Page 35: ...III 7 Controls 3 7 Roof Console BMII 192 A B A Compartment B Airconditioning heating ...
Page 42: ...III 14 Controls ...
Page 64: ...VI 8 Cabin ...
Page 68: ...VII 4 Check before Start up ...
Page 74: ...VIII 6 Engine Operation ...
Page 100: ...X 20 Mowers 10 6 Front Mower Lubrication Chart EC 087 1 ...
Page 136: ...XII 16 Maintenance Electrical System ...
Page 148: ...XV 4 Belt Drive ...
Page 154: ...A 2 Appendix ...
Page 155: ...A 3 Appendix ...