X - 27
Mowers
Lock the mowing units against lowering
using appropriate securing chains.
Remove the hex. nuts from the bolts (1).
Undo the connecting bolts (2).
Carefully remove floor plate (3) to the rear.
Store floor plates, bolts and nuts at a secure place.
BM301070
1
2
3
150
BM304100
1
Once the cross conveyor installed, the guard cloth (1) of
the right and left hand mowing unit must be cut off as
shown in the figure.
10.8.4 Engaging the auger montitoring mode
To engage the auger monitoring mode you must first
activate it as follows at the Infocenter:
Before switching on the ignition be sure
no persons are standing in the immedia-
te vicinity of the machine.
BMII-157
F1
F2
F3
F4
1
BMII-162
F1
F2
F3
F4
Set ignition key to position I or II.
Wait for the self test to run.
After the ignition has been switched on,
the start screen "Road Driving or Field
Operation" appears on the display.
Access the main menu by pressing the button (1).
Press F1
Settings.
Press F4
Next page.
Activate F1
Auger monitoring.
Summary of Contents for Big M II
Page 2: ......
Page 4: ...Vorwort Notizen ...
Page 28: ...II 14 Safety ...
Page 35: ...III 7 Controls 3 7 Roof Console BMII 192 A B A Compartment B Airconditioning heating ...
Page 42: ...III 14 Controls ...
Page 64: ...VI 8 Cabin ...
Page 68: ...VII 4 Check before Start up ...
Page 74: ...VIII 6 Engine Operation ...
Page 100: ...X 20 Mowers 10 6 Front Mower Lubrication Chart EC 087 1 ...
Page 136: ...XII 16 Maintenance Electrical System ...
Page 148: ...XV 4 Belt Drive ...
Page 154: ...A 2 Appendix ...
Page 155: ...A 3 Appendix ...