Initial operation
6
Checklist for initial operation
6.1
EasyCut B 970
Original Operating Instructions 150000711_01_en
39
6
Initial operation
This chapter describes assembly and adjustment work on the machine which may be carried
out by qualified technicians only. Here, the notice “Personnel qualification of technicians”
applies,
WARNING
Risk of injury or damage to the machine due to faulty initial operation
If the initial operation is carried out incorrectly or incompletely, the machine may present
defects. As a result, people may be injured or killed or the machine may be damaged.
Initial operation must only be carried out by authorised technicians.
Read in full and observe the “Personnel qualification of technicians”,
.
WARNING
Risk of injury due to non-observance of relevant safety instructions
If the relevant safety instructions are not observed, persons may be seriously injured or killed.
To avoid accidents, the relevant safety instructions must be read and observed,
WARNING
Risk of injury due to non-observance of safety instructions
If the relevant safety routines are not observed, persons may be seriously injured or killed.
The safety routines must be read and observed to avoid accidents,
.
6.1
Checklist for initial operation
ü
The machine is mounted according to assembly instructions of the machine.
ü
All the screws and nuts have been checked to make certain they are tight and tightened to
the specified tightening torques,
ü
The safety devices are mounted and checked for completeness and damage.
ü
The machine is fully lubricated,
ü
The oil level has been checked for all gearboxes,
.
ü
The hydraulic system has been checked for leaks.
ü
The tractor corresponds to the machine requirements,
ü
The axle loads, the minimum counterweight and the total weight have been checked.
ü
The universal shaft length has been checked and adjusted,
ü
The blades have been inserted,
.
ü
The hydraulic system has been vented.
ü
The friction clutch has been vented,
ü
The coupling points have been adapted,