6
Initial operation
6.2
Adapting Coupling Points
40
EasyCut B 970
Original Operating Instructions 150000711_01_en
6.2
Adapting Coupling Points
KMG000-033
Lower link pin
The three-point linkage is designed for category II and III.
The machine has been prepared at the factory for category II.
Mount a ball sleeve category II (1) inside on the lower link pins (2).
Secure the lower link pins (2) with the linch pin (4) and the safety chain (5).
Conversion to category III
Pull out the lower link pins (2).
Mount a ball sleeve category III (1) outside on the lower link pins (2).
Secure the lower link pins (2) with the linch pin (4) and the safety chain (5).
Top link pin
The top link pin (1) is designed for category II and III.
KM000-107
Category II (cat. II)
Loosen the linch pin (3) and pull out the top link pin (1).
Insert the top link pin (1) in the position (I) or (II) and through the ball sleeve cat. II (2).
The thicker journal of the top link pin (1) is facing outwards.
Secure the top link pin with the linch pin (3).
Make sure that the anti-twist lock (4) of the top link pin is in the recess.