LOADING AND SECURING
104
Operating instructions • Load Carrier • 505410638-02 • 07/2019
► Place the sliding shoes on the footing
beam in the required position and al-
low them to engage.
1
2
3
Fig. 8-22:
Sliding shoe secured with plug-in
bolt and spring cotter pin
1
Spring cotter pin
2
Plug-in bolt
3
Sliding shoe
► Insert the plug-in bolt into the hole.
► Secure the plug-in bolt with a spring
cotter pin.
► Insert the support beam vertically into
the sliding shoes.
ü
The Multi Fix system has been inser-
ted.
Securing steel pipes with the Multi Fix
system
► Position the steel pipes on the footing
beam between the vertical support
beams
(see "Fig. 8-18: Multi Fix system",
► Install the safety net at the ends of the
(see "Fig. 8-18: Multi Fix sys-
.
► Pull the tension straps through the
eyelets of the safety nets.
► Hook the tension straps onto the Multi-
lock external frame.
► Lash the tension straps.
ü
The steel pipes are secured.