SUPERSTRUCTURE OPERATION
86
Operating instructions • Load Carrier • 505410638-02 • 07/2019
► Turn the drain valves on the hand
pumps in the corner posts clockwise to
the stop.
ð
The drain valves are closed.
1
Fig. 6-51:
Raising the lifting roof
1
Hand lever
► By pumping with the hand levers, raise
the roof to the desired position.
ü
The lifting roof is raised.
Lowering the hydraulic lifting roof
1
Fig. 6-52:
Lowering the lifting roof
1
Drain valve
► Open the drain valves on the hand
pumps in the corner posts by one turn
counter-clockwise.
ü
The drain valves are opened.
ü
The lifting roof is lowered.
Operating the superstructure height ad-
justment
INFO
Observe the legally permitted total height
for the superstructure height adjustment.
Depending on the version, the superstruc-
ture height at the front can be adjusted in
increments from 50 mm to 100 mm. De-
pending on the version, the superstructure
height at the rear can be adjusted in incre-
ments from 50 mm to 100 mm.
þ
The doors are open.
þ
The side curtain is open.
► Raise the lifting roof until the load on
the adjustment bolts on all four corners
is relieved.
1
Fig. 6-53:
Swivelling the adjustment bolt out-
wards
1
Adjustment bolt
► Pull the adjustment bolt out of the
latched position and swivel outwards.
► Allow the adjustment bolt to engage
again at the desired height.
► Adjust the height of the centre posts
ð
The centre posts have been adjus-
ted to the superstructure height.