5 Installation at Site
21 of 44
Hya-Duo D FL
5.4.2 Fitting an expansion joint (optional)
DANGER
Sparks and radiant heat
Fire hazard!
▷
Take suitable precautions to protect the expansion joint if any welding work is
carried out.
CAUTION
Leaking expansion joint
Flooding of installation room!
▷
Do not apply any paint to the expansion joint.
▷
Keep the expansion joint clean.
▷
Regularly check for cracks or blisters, exposed fabric or other defects.
ü
Sufficient clearance in all directions is provided for checking the expansion joint.
ü
The expansion joint is not insulated along with the pipeline insulation.
1. The expansion joint has a length limiter with solid-borne sound insulation.
2. Install the expansion joint in the piping free of twist or distortion. Never use the
expansion joint to compensate for misalignment or mismatch of the piping.
3. Evenly tighten the bolts crosswise. The ends of the bolts must not protrude from
the flange.
5.5 Installing operator-supplied valves
1. Any additional valves used (e.g. gate valve, water meter and lift check valve)
must comply with the local water supplier's requirements.
5.6 Electrical connection
DANGER
Electrical connection work by unqualified personnel
Risk of fatal injury due to electric shock!
▷
Always have the electrical connections installed by a trained and qualified
electrician.
▷
Observe regulations IEC 60364 and, for explosion-proof models, EN 60079.
WARNING
Incorrect connection to the mains
Damage to the mains network, short circuit!
▷
Observe the technical specifications of the local energy supply companies.
NOTE
For the electrical connection comply with the requirements to DIN 14462.