13 Commissioning Report
41 of 44
Hya-Duo D FL
13 Commissioning Report
The fire-fighting system specified below was today commissioned by the undersigned, authorised KSB Service
engineer who created this report.
Fire-fighting system details
Type series
........................................................................................................................................
Size
........................................................................................................................................
Serial number
........................................................................................................................................
Order number
........................................................................................................................................
Purchaser/place of installation
Purchaser
Place of installation
Name
....................................................
..........................................................................
Address
....................................................
..........................................................................
....................................................
..........................................................................
Operating data
For further data refer to the wiring diagram.
Start-up pressure
p
E
bar
....................................................
Inlet pressure monitoring p
inl
- x
(setting of inlet pressure switch)
....................................................
Stop pressure
p
A
bar
....................................................
Inlet pressure
p
inl
[bar]
....................................................
Pre-charge pressure
of accumulator
p
pre-charge
[bar]
....................................................
Special information
If, in addition, the system is operated with accumulators of Groups III / IV to the Pressure Equipment Directive, the
responsible technical inspection body must be informed about commissioning of the system.
The operator or operator's representative herewith confirm to have received instructions on how to operate and
service the fire-fighting system. The relevant circuit diagrams and the operating manual have been handed over.
Non-conformities found during commissioning
Deadline for remedial action
Non-conformity
1 ............................................................................................
..........................................................................
.............................................................................................................
..........................................................................
.............................................................................................................
..........................................................................
.............................................................................................................
..........................................................................
Name of KSB representative
Name of purchaser or representative
.............................................................................................................
..........................................................................
Place
Date
.............................................................................................................
..........................................................................