INSTALLATION, OPERATION &

MAINTENANCE MANUAL

KSTAR BluE-H5/H3

ENERGY STORAGE SYSTEM

QuickInstallation

Step 1    Remove the battery and inverter from the packaging box.

Step 2   Assemble the battery mounting panel on the battery.

1. Battery Installation

Step 

3

 

   Position the battery parallel to the wall and use a Φ8mm drill to drill holes at a 

depth of about 70mm in the wall for subsequent fixation of the mounting plates.

Step 

4

 

   Remove the debris baffle and secure the battery to the wall with screws and gaskets. 

NOTE: 

The type

 B

 RCD must be installed on the backup port of the system.In additon, the 

installation of inverter must fulfill AS/NZS 3000,AS/NZS 4777.1 and AS/NZS 5033.

                 To assemble the second (and all other) battery, repeat steps 6 and 7,
respectively. 

Step 

5

 

BluE-Energy Storage System - 
Quick Installation Guide

2.Inverter Installation

Inverter Installation.

Step

 6

 

Hang the inverter onto the mounting panels, adjust the entire system and

ensure that the battery and the inverter have been securely hung onto the panels and

brackets.

Step

 7

3.AC Cable Assembly and Connection

 

WARNING:

There are"L" "N'' ''    '' symbols marked inside the connector, the Line wire of 

grid must be connected to "L" terminal; the Neutral wire of grid must be 

connected to "N" terminal; the Earth of grid must be connected to ''

''

Object

Description

Value

12mm to 18mm 

4mm² to 10mm²

approx.13mm

approx.53mm

External diameter

Copper conductor cross-section

Stripping length of the insulated conductors

Stripping length of the outer sheath of the AC cable

A

B

C

D

The PE conductor must be 10mm longer than the L and N conductors

A

B

D

C

U
O

W

For all AC connections, 4-10mm² 105 XJ cable is required to be used. Please make 
sure the resistance of cable is lower than 1 ohm. If the wire is longer than 20m, it's 
recommended to use 10mm² cable.

b. Insert the conductor into the 
suitable ferrule acc. to DIN 
46228-4 and crimp the contact.

c. Unscrew the swivel nut from the threaded sleeve and 
thread the swivel nut and threaded sleeve over the AC cable.  

d. Insert the crimped conductors L, N and PE into the 
corresponding terminals and tighten the screw with a 
hex  key  wrench  screwdriver(size:2.5,  1.2-2.0Nm). 
Ensure that all conductors are securely in place in the 
screw terminals on the bush insert.

e. Screw the swivel nut onto the threaded sleeve. This seals the AC connector and provides 
strain relief for the AC cable. When doing so, hold the bush insert firmly by the locking cap. 
This ensures that the swivel nut can be screwed firmly onto the threaded sleeve.

 

d

e

f. Assembly the plug shell ,adapter as below 
picture, Push the adapter and Shell by hand 
until a “Click” is heard or felt. 

f

g. Plug the AC connector into the jack for the 
AC connection by hand until a “Click” is  
heard or felt. 

d

c

b

M5*1

2

 Screws

Debris Baffle, drill φ8, 
depth about 70 mm

ST6

.

3

*

50

Gasket