2
SETUP
4
(250/300 SIX DAYS, 125 EXC SIX DAYS EU)
–
Position the fork legs and tighten the screws of the triple clamp.
Guideline
Screw, top triple clamp
M8
17 Nm
(12.5 lbf ft)
Screw, bottom triple clamp
M8
15 Nm
(11.1 lbf ft)
Info
The rebound damping is located in the right fork leg
REB
(red
adjusting screw). The compression damping is located in the left
fork leg
COMP
(white adjusting screw).
Grooves are milled into the side of the top end of the fork legs. The
topmost milled groove must be flush with the top edge of the upper
triple clamp.
Position the bleeder screws toward the front.
101488-10
–
Remove screws
1
. Take off the handlebar clamps.
–
Remove screws
2
. Take off the handlebar supports.
–
Place the handlebar supports in the required position. Mount and tighten
screws
2
.
Guideline
Screw, handlebar support
M10
40 Nm
(29.5 lbf ft)
Loctite
®
243™
Info
Position the left and right handlebar supports evenly.
600824-10
–
Position the handlebar.
Info
Make sure the cables and wiring are positioned correctly.
–
Position the handlebar clamps. Mount and tighten the screws evenly.
Guideline
Screw, handlebar clamp
M8
20 Nm
(14.8 lbf ft)
Info
The markings on the handlebar should be at the center of the handlebar
clamps.
Keep the gap widths equal when tightening.
–
Position the speedometer and connector board. Mount and tighten screws.
Guideline
Remaining screws, chassis
M6
10 Nm (7.4 lbf ft)
B01751-01
–
Position the controls on the right half of the handlebar.
Info
The routing of the cables can be seen in the figure.
Summary of Contents for 125 EXC EU 2014
Page 2: ......