11
SERVICE WORK ON THE CHASSIS
84
B01606-12
Main work
(Option: Without ABS)
–
Loosen nut
.
–
Loosen nuts
.
–
Adjust the chain tension by turning adjusting screws
on the left and right.
Guideline
Chain tension
5… 7 mm (0.2… 0.28 in)
Turn adjusting screws
on the left and right so that the markings on the left
and right chain adjuster
are in the same position in relation to reference
marks
. The rear wheel is then correctly aligned.
Info
The upper chain section must be taut.
Chain wear is not always even, so you should check the setting at different
chain positions.
–
Tighten nuts
.
–
Make sure that chain adjusters
are fitted correctly on adjusting screws
.
–
Tighten nut
.
Guideline
Nut, rear wheel spindle
M14x1.5
90 Nm
(66.4 lbf ft)
Finishing work
–
Take the motorcycle off of the rear wheel stand. (
Summary of Contents for 2015 200 Duke
Page 1: ...OWNER S MANUAL 2015 200 Duke 2015 CO Art no 3213118en ...
Page 2: ......
Page 17: ...15 ...
Page 18: ...4 VIEW OF VEHICLE 16 4 1 View of vehicle front left example B00778 10 ...
Page 20: ...4 VIEW OF VEHICLE 18 4 2 View of vehicle rear right example B00779 10 ...
Page 129: ...14 ELECTRICAL SYSTEM 127 Finishing work Check the headlight setting p 124 ...