18
ENGINE
195
308596-11
–
Mount and tighten nut
with the washer.
Guideline
Nut, cylinder head
M6
10 Nm
(7.4 lbf ft)
Lubricated with
engine oil
18.5.24 Installing the camshafts
308603-10
–
Pull up the timing chain and insert intake camshaft
.
–
Place the timing chain over the camshaft gear of the intake camshaft.
Markings
are aligned with the flat areas of the camshaft.
Lock ring
engages in groove
.
–
Ensure that bleeder
are seated properly.
–
Slip in exhaust camshaft
.
–
Place the timing chain over the camshaft gear and position the camshaft in the
bearing seat.
–
Clean all oil nozzles thoroughly and blow out with compressed air.
–
Mount the camshaft bearing bridge.
Markings
are aligned with the flat areas of the camshaft.
Lock ring
engages in groove
.
Info
Ensure that the dowel pins are seated properly.
308594-11
–
Position guide rail
.
–
Mount screws
and tighten from the inside to the outside.
Guideline
Screw, camshaft bearing
bridge
M7x1
14 Nm
(10.3 lbf ft)
Lubricated with
engine oil
18.5.25 Checking the valve timing
Condition
Camshaft gears were not loosened.
308589-10
–
Mount the special tool and tension the timing chain.
Insert, timing chain tensioner (77229035000) (
–
Position special tool
.
Adjustment bush bridge (77229050044) (
–
Check the valve timing.
The special tool must be in full contact with the flat areas.
» If the special tool is not in full contact:
–
Take off the special tool.
–
Remove the camshaft. (
–
Pull the camshaft gears off the camshafts.
–
Adjust the valve timing. (
Summary of Contents for 350 EXC-F SIX DAYS EU
Page 2: ......
Page 235: ...233 ...