11 SERVICE WORK ON THE CHASSIS
54
11.16
Removing front fender
Preparatory work
–
Remove the start number plate. (
V00830-10
Main work
–
Remove screws
1
.
–
Remove screws
2
. Take off the front fender.
11.17
Installing front fender
V00831-10
Main work
–
Position front fender.
–
Mount and tighten screws
1
.
Guideline
Screw, front fender
M6
6 Nm (4.4 lbf ft)
–
Mount and tighten screws
2
.
Guideline
Screw, front fender
M6
6 Nm (4.4 lbf ft)
Finishing work
–
Install the start number plate. (
11.18
Removing the shock absorber
Preparatory work
–
Raise the motorcycle with a lift stand. (
A00044-10
Main work
–
Detach the brake line from the brake line guide.
–
Remove screw
1
and lower the rear wheel with the link fork
as far as possible without blocking the rear wheel. Secure the
rear wheel in this position.
–
Remove screw
2
, push splash protector
3
to the side, and
remove the shock absorber.
Summary of Contents for 85 SX 17/14 2021
Page 1: ...OWNER S MANUAL 2021 85 SX Art no 3214206en ...
Page 2: ......