2
SETUP
3
2.1
Unpacking and setting up the vehicle
S00694-10
–
Remove the straps and box.
S00695-10
–
Remove the adhesive tape in the upper area of the motorcycle.
S00696-10
–
Roll down the film at the sides.
Info
To avoid damaging the motorcycle during unpacking, leave the other films
on the vehicle until you have finished work on the vehicle.
–
Remove the separate enclosure and unpack it. Check the separate enclosure for
completeness.
–
Check the vehicle for transport damage.
S00697-10
–
Remove the controls from the transport holder.
–
Remove the screws and handlebar clamps.
–
Remove the transport holder.
M00791-01
–
Remove the right hand guard.
–
Position the controls on the right half of the handlebar. Tighten the screws.
Guideline
Remaining screws, chassis
M5
5 Nm (3.7 lbf ft)
Remaining chassis screws
M6
10 Nm (7.4 lbf ft)
–
Mount the right hand guard.
S00698-10
–
Position the handlebar.
–
Position the handlebar clamps. Tighten the screws evenly.
Guideline
Screw, handlebar clamp
M8
20 Nm
(14.8 lbf ft)
Markings
face backwards.
Markings
of the handlebar scale are located centrally between the handle-
bar clamps.