KTR Kupplungstechnik
GmbH
D-48407 Rheine
POLY
Operating-/Assembly Instructions
KTR-N
sheet:
edition:
49610 EN
12 of 24
9
Gezeichnet: 11.03.10
Pz/Bru
Ersatz für:
KTR-N vom 25.04.07
Schutzvermerk
ISO 16016 beachten. Geprüft:
16.03.10 Pz
Ersetzt durch:
4 Assembly
4.4 Assembly of the Type PKD
•
Plug flange hub and cam ring together
(see picture 12).
•
Hand-screw the parts first of all.
picture 12: assembly of the flange hub with cam ring
•
Assemble the cam section and flange hub with
cam ring to the shaft of the drive and driven side
(see picture 13).
•
Tighten the screws with a suitable torque key to the
tightening torque T
A
shown in table 4.
picture 13: assembly of cam section and flange hub with cam ring
•
Insert the elastomer elements in the cam section or
cam ring (see picture 14).
picture 14: assembly of the elastomer elements
•
Move the power packs in axial direction until the
dimension E is achieved (see picture 15).
•
If the power packs are already firmly assembled,
axial movement of the hubs on the shafts allows for
adjusting the dimension E (see picture 15).
•
Fasten the hubs by tightening the setscrews
DIN EN ISO 4029 with cup point (tightening torque
see table 3).
picture 15: coupling assembly
!
C A U T I O N !
Having set the coupling into operation, the tightening torque of the screws and wear of
elastomer elements have to be inspected in usual maintenance intervals.