Maintenance
RG268-8135-6
167
01/2019
Every 2 years
Coolant - change
Open the engine compartment and side cover (page 144).
Place a container with a minimum capacity of 5 litres under the coolant drain plug.
Remove the radiator cap (1) by turning it anticlockwise.
Open the central coolant drain plug (1) and drain the coolant
completely.
Flush out the cooling system if the coolant is very dirty. To do this,
spray water without additives into the cooling system with a hose
through the filler opening until clear water emerges from the outlet.
Close the central drain.
To perform the following tasks, the dozer and boom must be positioned in the forward direction of
travel.
Drain only when engine is cold, otherwise there is a risk of scalding!
Filling capacity
Canopy
Cab
Radiator
2.4 litres
2.6 litres
Expansion reservoir
0.6 litres
0.6 litres
STOP
1
1
Summary of Contents for 50740
Page 8: ...Tables 6 RG268 8135 6 01 2019...
Page 32: ...30 RG268 8135 6 01 2019 Safety rules...
Page 48: ...46 RG268 8135 6 01 2019 Description of the excavator...
Page 62: ...60 RG268 8135 6 01 2019 Assembly and functions...
Page 128: ...126 RG268 8135 6 01 2019 Operation...
Page 135: ...Troubleshooting RG268 8135 6 133 01 2019...
Page 136: ...134 RG268 8135 6 01 2019 Troubleshooting...
Page 139: ...Maintenance RG268 8135 6 137 01 2019...
Page 174: ...172 RG268 8135 6 01 2019 Safety inspection...
Page 193: ...Accessories RG268 8135 6 191 01 2019...
Page 194: ......