Operation
RG268-8135-6
83
01/2019
Approach overhangs and edges of ditches carefully as they
could cave in.
Drive slowly downhill, do not allow the vehicle speed to in-
crease uncontrollably.
Close the cab door (cab version).
When driving, the bucket should be approx. 200 to 400 mm (A)
above the ground (see figure).
Raise the dozer to the top position.
Select an appropriate engine speed.
Summary of Contents for 50740
Page 8: ...Tables 6 RG268 8135 6 01 2019...
Page 32: ...30 RG268 8135 6 01 2019 Safety rules...
Page 48: ...46 RG268 8135 6 01 2019 Description of the excavator...
Page 62: ...60 RG268 8135 6 01 2019 Assembly and functions...
Page 128: ...126 RG268 8135 6 01 2019 Operation...
Page 135: ...Troubleshooting RG268 8135 6 133 01 2019...
Page 136: ...134 RG268 8135 6 01 2019 Troubleshooting...
Page 139: ...Maintenance RG268 8135 6 137 01 2019...
Page 174: ...172 RG268 8135 6 01 2019 Safety inspection...
Page 193: ...Accessories RG268 8135 6 191 01 2019...
Page 194: ......