ENGINE
GL6000A-AU-B, GL6000D-AU-B,GL9000A-AU-B, GL9000D-AU-B, WSM
1-S29
Nozzle Holder Assembly and Glow Plug
1. Remove the overflow pipe (1).
2. Remove the nozzle holder assemblies (2).
3. Remove the copper gasket (5) and heat seal (6).
4. Remove the lead (3) from the glow plugs (4).
5. Remove the glow plugs (4).
(When reassembling)
• Replace the copper gasket and heat seal with new one.
9Y1211607ENS0040US0
Nozzle Heat Seal Removal Procedure
IMPORTANT
• Use a plus (phillips head) screw driver (1) that has a
diameter which is bigger than the heat seal hole (Approx.
6 mm (0.2 in.)).
1. Drive screw driver (1) lightly into the heat seal hole.
2. Turn screw driver three or four times each way.
3. While turning the screw driver, slowly pull the heat seal (4) out
together with the injection nozzle gasket (3).
4. If the heat seal drops, repeat the above procedure.
(When reassembling)
• Heat seal (4) and injection nozzle gasket (3) must be changed
when the injection nozzle is removed for cleaning or for service.
9Y1211607ENS0041US0
Tightening torque
Overflow pipe retaining nut
20 to 24 N·m
2.0 to 2.5 kgf·m
15 to 18 lbf·ft
Nozzle holder assembly
49 to 68 N·m
5.0 to 7.0 kgf·m
37 to 50 lbf·ft
Glow plug
7.9 to 14 N·m
0.80 to 1.5 kgf·m
5.8 to 10 lbf·ft
(1) Overflow Pipe
(2) Nozzle Holder Assembly
(3) Lead
(4) Glow Plug
(5) Copper Gasket
(6) Heat Seal
(1) Plus Screw Driver
(2) Injection Nozzle
(3) Injection Nozzle Gasket
(4) Heat Seal
KiSC issued 06, 2016 A