Operation
69
Tilt the auxiliary port pedal (1) backward.
To operate the implement, press the auxiliary port pedal
downward (figure position ).
Locking the auxiliary port pedal
The auxiliary port pedal (1) may be locked with the locking
screw (2) for usage with special devices, such as augers
and crushers.
You will find the locking screw, which is part of the standard
equipment, in the tool compartment (page 40).
If there is no hole for the locking screw in the mat,
drill a suitable hole.
Placing out of operation
Park the excavator in such a way that it can not
move and is secured against unauthorised use.
Drive the excavator on level ground. The machine should
be parked under a roof.
All hydraulic cylinders have to be extended half way (see
figure), the boom has to be in line with the excavator, the
dozer has to be lowered to the ground and the extendable
track width has to be set to standard track width.
Lock the swivel frame and the control levers (page 21, 22).
Reduce the engine speed to idle speed and let the engine
run for approx. 5 minutes to let it cool down.